Diab Engineering Boddington Gold

The Diab Engineering Boddington Gold project involved the construction of a freestanding plant and equipment enclosure within an active mining environment. The project required a robust and compliant fire rated solution capable of meeting both operational and performance requirements.

  • Boddington, WA
  • Speedpanel
  • Mining

Cubic was engaged to deliver the Speedpanel installation and provide design coordination and fire compliance guidance throughout the project. Through close collaboration with the client and project stakeholders, Cubic assisted in developing practical construction solutions aligned with the project’s technical and operational requirements.

Ready to discuss your next project?

Connect with Cubic to see how we can assist with the successful delivery of your next project.

Contact Us