Diab Engineering Boddington Gold
The Diab Engineering Boddington Gold project involved the construction of a freestanding plant and equipment enclosure within an active mining environment. The project required a robust and compliant fire rated solution capable of meeting both operational and performance requirements.
- Boddington, WA
- Speedpanel
- Mining
Cubic was engaged to deliver the Speedpanel installation and provide design coordination and fire compliance guidance throughout the project. Through close collaboration with the client and project stakeholders, Cubic assisted in developing practical construction solutions aligned with the project’s technical and operational requirements.