Gruyere Mine Site Speedpanel Wall
The Gruyere Mine Site project required the installation of a fire rated wall system within an existing operational facility. The works demanded careful planning and coordination to ensure integration with the existing structure while maintaining compliance with the project’s fire performance requirements.
- Great Victoria Desert, WA
- Fire Rated Speedpanel
- Mining
Cubic was engaged to deliver the fire rated Speedpanel solution and provide technical guidance regarding fire rated construction detailing and compliance. The project further demonstrated Cubic’s ability to deliver specialist fire rated systems within operational industrial environments.